- Category: Iron & Steel
COMPLETE STAINLESS STEEL SLAB MANUFACTURING PLANT
COMPLETE STAINLESS STEEL SLAB MANUFACTURING PLANT
Used second hand A Complete Stainless Steel Slab Manufacturing Plant with,
86 Ton EAF and CCM Plant as per scope of supply as below :
86 Ton EAF and CCM Plant as per scope of supply as below :
Make: ThyssenKrupp AG (German Make)
Year: 1989
(1)EAF (Electric Arc Furnace)
- Furnace Capacity : 86 Ton/Heat
- Transformer Capacity : AC 70MVA (3 Phase)
- T-T Time : 65 min/Heat
- O2 Blowing : 4,000 N㎥/Hr
- Carbon / Lime Injection
Dog House System for Clean Operation Environment
(2) AOD (Argon Oxygen Decarburization)
-Vessel Capacity : 90 Ton/Heat
- Vessel Volume : 47 ㎥
- T-T Time : 60 min/Heat
- Top Lance Gas Flow-rate : 6,000 N㎥/Hr
- Tuyere Gas Flow-rate : 6,000 N㎥/Hr
(3) VOD (Vacuum Oxygen Decarburization)
(4) CCM(Continuous Casting machine)
- Type : Vertical Bending
- Metallurgical Length : 20.3m
- Slab Size : 150, 200t x 800/1600w
- Tundish Capacity : 25 ton
- Mold MLAC : Co +60
- Dummy Bar Feeding : Bottom Feeding Type
(Main Equipments )
Scrap Basket
Scrap Transfer Car
Dedusting Duct
AOD exhaust Gas Heat Exchanger
AOD Collected Dust Hopper
EAF Dust Collector Facility
AOD Dust Collector Facility
EAF Scrap Basket
Slag Pot
Laddle Treatment Facility
AOD Electric Room
AOD
AOD Converter
AOD online Heating Burner
AOD Tilting Device
Ladle Vertical Heating Burner
250Ton Teeming Crane
EAF closed Cooling System
Electrode assemble Machine
Electrode change Machine
Oxygen Lance Machine
EAF Skimming Machine
Continuous Casting Turret
Ladle Treatment Facility
EAF Roof (Spare)
Alloy Hopper Facility
AOD Offline Heating Shop
EAF Dust Collector and its Duct from EAF
Ladle Filler Supplying Facility
Tundish Heating Burner
CC Turret
CC Long Nozzle Manipulator
Laddle Heating Burner Facility
Manual Cutting Machine
No1 Grinding Machine
No2. Grinding Machine
No3. Grinding Machine
No4. Grinding Machine
CC (Continuous Casting)
Torch Cutting Machine
Slab Marking Machine
Water Treatment Facility
Cooling Tower
Utility Pump Room
Chiller Facility
Air Compressor
Gas Holder
Air Dryer
22kV Distribution Panel
6.6kV Distribution Panel
100MVA Main Transformer
154/22kV Transformer
Year: 1989
(1)EAF (Electric Arc Furnace)
- Furnace Capacity : 86 Ton/Heat
- Transformer Capacity : AC 70MVA (3 Phase)
- T-T Time : 65 min/Heat
- O2 Blowing : 4,000 N㎥/Hr
- Carbon / Lime Injection
Dog House System for Clean Operation Environment
(2) AOD (Argon Oxygen Decarburization)
-Vessel Capacity : 90 Ton/Heat
- Vessel Volume : 47 ㎥
- T-T Time : 60 min/Heat
- Top Lance Gas Flow-rate : 6,000 N㎥/Hr
- Tuyere Gas Flow-rate : 6,000 N㎥/Hr
(3) VOD (Vacuum Oxygen Decarburization)
(4) CCM(Continuous Casting machine)
- Type : Vertical Bending
- Metallurgical Length : 20.3m
- Slab Size : 150, 200t x 800/1600w
- Tundish Capacity : 25 ton
- Mold MLAC : Co +60
- Dummy Bar Feeding : Bottom Feeding Type
(Main Equipments )
Scrap Basket
Scrap Transfer Car
Dedusting Duct
AOD exhaust Gas Heat Exchanger
AOD Collected Dust Hopper
EAF Dust Collector Facility
AOD Dust Collector Facility
EAF Scrap Basket
Slag Pot
Laddle Treatment Facility
AOD Electric Room
AOD
AOD Converter
AOD online Heating Burner
AOD Tilting Device
Ladle Vertical Heating Burner
250Ton Teeming Crane
EAF closed Cooling System
Electrode assemble Machine
Electrode change Machine
Oxygen Lance Machine
EAF Skimming Machine
Continuous Casting Turret
Ladle Treatment Facility
EAF Roof (Spare)
Alloy Hopper Facility
AOD Offline Heating Shop
EAF Dust Collector and its Duct from EAF
Ladle Filler Supplying Facility
Tundish Heating Burner
CC Turret
CC Long Nozzle Manipulator
Laddle Heating Burner Facility
Manual Cutting Machine
No1 Grinding Machine
No2. Grinding Machine
No3. Grinding Machine
No4. Grinding Machine
CC (Continuous Casting)
Torch Cutting Machine
Slab Marking Machine
Water Treatment Facility
Cooling Tower
Utility Pump Room
Chiller Facility
Air Compressor
Gas Holder
Air Dryer
22kV Distribution Panel
6.6kV Distribution Panel
100MVA Main Transformer
154/22kV Transformer
Ref. No. BPMB111822